Last week, our Medserv Malta base witnessed a successful operation as the operations team skillfully offloaded a substantial 2,500 metric tons of steel. This significant undertaking was accomplished with a strong emphasis on safety and efficiency, ensuring that the operation was completed without incident and within the designated timeframe.